Manage light manufacturing, Bill of Materials (BOM) disassembly, component reservations, assembly costing, and finished goods creation.
Routes:
/manufacturing/work-orders /manufacturing/work-orders/new /manufacturing/work-orders/:id Work Orders & Assemblies
The Work Orders & Assemblies module manages light assembly, kit building, and manufacturing. It decomposes multi-component Bills of Materials (BOM), allocates raw material parts, tracks work-in-progress (WIP), and calculates finished goods unit costs.
Work Order Lifecycle & Costing
stateDiagram-v2
[*] --> Draft : Create Work Order
Draft --> Planned : Plan / Allocate Components
Draft --> Cancelled : Cancel
Planned --> InProgress : Start Assembly (Issue Components to WIP)
Planned --> Cancelled : Cancel (Release Component Reservations)
InProgress --> Completed : Finish Assembly (Stock Finished Units)
InProgress --> Cancelled : Abort Assembly (Return Unused Components)
Completed --> [*]
1. Work Order States & Progression
Draft: Production job created, target assembly selected, and component requirements calculated from BOM.Planned: Components checked and reserved from warehouse storage bins. Shortages enter the Purchase Demands queue.In-Progress: Production underway. Component stock is physically issued from bins to Work-In-Progress (wipbin).Completed: Finished goods verified, unit cost calculated, finished items moved to Putaway staging, and work order closed.Cancelled: Job cancelled; reserved or issued components returned to storage.
2. Live Assembly Costing & Valuation
When completing a build (completeBuild), the system calculates total job costs and finished inventory valuation:
Component Materials Cost = Sum(Component Expected Quantity * Component Unit Cost)
Total Assembly Labor Cost = Assembly Cost Per Unit * Target Quantity
Total Work Order Cost = Component Materials Cost + Total Assembly Labor Cost + Additional Cost
Finished Product Unit Cost = Total Work Order Cost / Target Quantity
- Component Materials Cost: Calculated from the snapshotted Bill of Materials components (
work_order_components) based on expected quantities and their unit cost / Moving WAC. - Assembly Cost Per Unit (
assemblyCostPerUnit): Variable direct labor or machine running cost entered per finished unit. - Additional Cost (
additionalCost): Fixed lump-sum overhead, machine setup fee, or subcontracting charge for the overall build. - Inventory Capitalization: Completing the build capitalizes the finished products into warehouse inventory at the new
Finished Product Unit Cost, while crediting the consumed raw materials.
Step-by-Step Workflows
1. Creating and Executing a Work Order
- Go to Manufacturing → Work Orders (
/manufacturing/work-orders). - Click New Work Order (
/manufacturing/work-orders/new). - Select the Assembly Product and enter the Target Build Quantity.
- The system snapshots component requirements from the active Bill of Materials into
work_order_components. - Enter any Unit Assembly Cost (labor per unit) and Additional Cost (setup/overhead).
- Click Plan Work Order to verify and reserve component stock.
- When assembly begins, click Start Assembly to issue components to WIP.
- Upon completion, verify output quantities and click Complete Work Order.
Field Reference
| Field | Description |
|---|---|
| Work Order Number | Production identifier (WO-...). |
| Assembly Product | Finished item being manufactured. |
| Target Build Quantity | Planned assembly count. |
| Components | List of raw materials and sub-assemblies required with unit costs. |
| Assembly Cost / Unit | Direct variable labor and machine cost per assembled unit (assemblyCostPerUnit). |
| Additional Cost | Fixed lump-sum setup or overhead fee (additionalCost). |
| Total Cost | Total build cost (components + assembly labor + additional cost). |
| Status | Stage (Draft, Planned, In-Progress, Completed, Cancelled). |
Field Reference & Data Dictionary
Key database fields, input parameters, and definitions associated with this workflow screen:
| Field / Parameter | Display Name | Description & Rules |
|---|---|---|
| order_number | Work Order Number | Unique production job identifier (e.g. WO-2026-00032). |
| product_id | Assembly Product | Finished manufactured item to be produced. |
| target_quantity | Target Build Quantity | Planned number of finished units to assemble. |
| status | Work Order Status | Production state (Draft, Planned, In-Progress, Completed, Cancelled). |
| assembly_cost_per_unit | Assembly Cost / Unit | Direct variable labor and machining cost per assembled finished unit. |
| additional_cost | Additional Cost | Fixed lump-sum overhead, machine setup, or subcontracting charge. |